Featured Sydney Commercial Projects

Real case studies demonstrating our engineering approach to heavy traffic durability, precise layout design, and rapid zero-disruption delivery.

DHL Logistics Hub • Arndell Park
DHL Logistics Hub • Arndell Park

DHL Distribution Centre Walkway & Zebra Crossing

Location Arndell Park, NSW
Scope Walkways & Crossings
Timeframe Weekend Night Shifts

High-build safety green epoxy pedestrian walkways and laser-aligned zebra crossings installed across live logistics zones with zero operational downtime.

Bunnings Eastgardens Commercial Hub
Bunnings Eastgardens Commercial Hub

High-Turnover Commercial Car Park & Traffic Flow

Location Eastgardens, Sydney NSW
Scope 650+ Bays & DDA Stencils
Timeframe Night Shifts (3 Days)

Complete overnight re-marking of 650+ commercial bays, traffic direction arrows, and accessible DDA spaces using high-durability reflective chlorinated rubber.

Heavy Manufacturing Facility
Heavy Manufacturing Facility

Heavy-Duty Epoxy Solid Green Safety Corridor

Location Wetherill Park, NSW
Scope 1,200m² Solid Epoxy
Timeframe Shutdown Schedule

Heavy-duty diamond-ground epoxy safety walkway system with high-contrast safety yellow borders engineered for chemical resistance and intense forklift traffic.

High-Friction Safety Demarcation
High-Friction Safety Demarcation

AS 4586 R12 Non-Slip Friction Demarcation

Location Silverwater, NSW
Scope Ramps & Wet Zones
Timeframe Single Weekend Shift

High-friction textured cold applied plastic (CAP) and aluminum oxide grit line marking delivering certified R12 slip resistance across steep vehicle ramps.

Logistics Centre • Western Sydney
Logistics Centre • Western Sydney

Cross-Hatched Safety Pathway & Hazard Zones

Location Ingleburn, NSW
Scope Pedestrian Exclusion Zones
Timeframe Overnight Application

Precision 45-degree chevron safety hatching and boundary lines installed overnight to eliminate blind spots and establish compliant pedestrian exclusion zones.

National Freight Facility
National Freight Facility

Pallet Bay Staging & High-Reach Forklift Aisles

Location Moorebank, NSW
Scope Pallet Bays & Aisle Numbers
Timeframe 3 Staged Shifts

Captive shot blasting and ultra-durable polyurethane line marking with high-contrast alphanumeric floor stencilling across a 35,000m² automated distribution facility.